Room additions & second stories in Los Angeles

RODO Development Inc. builds room additions, primary suites and full second stories across Los Angeles. We add space that matches your home's architecture, structure and finishes, so the addition reads as if it was always there.

For families who have outgrown the house but not the neighborhood.

  • You need a primary suite, more bedrooms or a dedicated office
  • Parents, adult children or guests are joining the household
  • Your lot has room to build out, or the house can go up
  • Moving would mean giving up a location, school or street you love

What your home addition includes.

01

Feasibility review

Setbacks, height limits, floor-area limits and lot coverage checked before design, so the addition is drawn to what your lot allows.

02

Second-story additions

New upper floors, stairs and structure designed to sit naturally on the existing house.

03

Ground-floor expansions

Bump-outs, extended kitchens and family rooms, and new primary suites.

04

Structure & foundations

Engineering, new footings and, where required, reinforcement of the existing structure.

05

Envelope tie-ins

Roofing, siding, stucco and windows integrated so old and new read as one building.

06

Systems capacity

Electrical service, heating and cooling, and plumbing extended or upgraded to serve the larger home.

Building up, on a house that is already standing.

A second story adds a lot of house without giving up the yard. It also asks the most of the home below it, so the structure is studied before the design is drawn.

Second-story addition guide
What the house can carry
Our engineer checks the footings and walls. Older Los Angeles homes often need new footings, posts, beams or shear walls to take the added load.
Height and the envelope
On most City of LA R1 lots a second story has to fit under an encroachment plane that slopes inward from 20 feet up, which is why many step in from the walls below.
Where the stair lands
The stair takes real space from the ground floor, so its position is settled before the bedrooms upstairs are planned.
Opening the roof
The roof comes off over part or all of the house. We sequence the work to get the home dried in again quickly.
Partial second stories
Building over a garage or one wing keeps the roof and structural work to one area and can sit more easily within the height rules.
The ground floor, improved
The structural work opens walls downstairs anyway. It is often the moment to fix the kitchen layout or move a bathroom.

Building out: a new wing, suite or family room.

A ground-floor addition extends the house into the lot: a primary suite at the back, a family room off the kitchen, a bedroom for a parent. It leaves the existing roof and structure largely alone.

Up or out: how to decide
Primary suites
Bedroom, bath and closets planned as one piece, with plumbing routes and windows placed for privacy and light.
Family rooms & kitchens
Extending the back of the house to open the kitchen and living space to the yard.
New foundations
New footings are engineered for the addition and tied to the existing foundation, or separated from it, so the two do not move against each other.
Setbacks and yard
The footprint has to respect front, side and rear setbacks and, in many zones, a lot coverage limit. Every square foot comes out of the garden.
Matching the house
Roof pitch, eave depth, ceiling heights, window proportions and the stucco or siding are matched so the addition reads as original.
Staying at home
Most of the work happens outside the existing walls until the final connection, so many families stay in the house.

First, what your lot allows.

Whether you can add on, and how much, is decided by zoning before it is decided by design. We check the numbers at the first visit so nobody pays for drawings the city will not approve.

LA building permits guide
Floor area
In the City of LA, the Baseline Mansionization and Baseline Hillside ordinances cap floor area for the whole house. Up or out, an addition draws on the same allowance.
Homes already at the limit
If the house has used its floor area, an addition may not be possible. An ADU, which state law treats differently, sometimes is.
Permit history
The city works from the permitted floor area, so an unpermitted room or converted garage has to be dealt with during plan check.
Hillside, coastal and historic lots
These add a review, a soils report or both before building plan check. We plan for them at the start.
Other cities
Santa Monica, Beverly Hills, Pasadena and others set their own limits and run their own review, some with design review or story poles.
Fees on added space
School district fees can apply to additions of more than 500 square feet. We identify them early so they are in the budget.

Six steps, one accountable team.

  1. 01

    Consultation & site visit

    We walk the property, discuss how you want to use the new space and take a first look at what zoning is likely to allow.

  2. 02

    Design & engineering

    Design and structural engineering develop together; soils or geology reports are commissioned if the site calls for them.

  3. 03

    Permits

    Additions require building permits and, depending on the property, zoning or planning review. We manage the submission, plan check and corrections.

  4. 04

    Fixed proposal

    A line-item proposal covers the new structure, tie-ins to the existing house and every finish, before ground is broken.

  5. 05

    Build

    Foundations, framing, roof and envelope, then systems and finishes, with your project manager coordinating inspections and weekly updates.

  6. 06

    Walkthrough & warranty

    A final walkthrough of the new space and its connections to the old, punch list, documentation and warranty information.

Our full process

What shapes the budget and the schedule.

Every property and every brief is different, so we do not publish price lists or generic timelines. These are the factors that matter most. Your fixed proposal confirms the price and an estimated schedule before work begins.

Any schedule or timeline we discuss is an estimate. The actual timeline depends on the final scope of work, design decisions, permits and inspections, and material availability.

What affects cost

Up or out
A second story and a ground-floor expansion carry different structural and foundation work.
Size and complexity
Square footage, rooflines and how many rooms are affected inside the existing home.
Foundations and soil
Soil conditions and existing footings determine how much foundation work is needed.
Upgrades to the existing house
Adding a floor can require strengthening the structure below, or upgrading electrical and HVAC capacity.
Matching the existing home
Recreating original materials and details can be more involved than starting fresh.
Finish level
As with any project, materials and fixtures make a significant difference.

What affects the timeline

Zoning and plan review
Projects that need planning review in addition to plan check take longer to approve.
Engineering and reports
Soils, geology or survey work has to be completed before plans can be finalized.
Weather while open
Until the new structure is dried in, rain can affect the schedule.
Lead times
Windows, roofing and custom finishes are ordered early to keep the build moving.
Living at home
Working around an occupied house, particularly for a second story, can change sequencing.

Permits in Los Angeles, explained.

An addition changes the footprint or height of your home, so it is reviewed against both zoning rules and the building code.

Zoning first
Setbacks, height limits, lot coverage and floor-area limits define how big an addition can be. In the City of Los Angeles, single-family floor area is governed by the Baseline Mansionization and Baseline Hillside ordinances; other cities have their own versions.
Structural plan check
Engineering calculations and drawings are reviewed for the new structure and its connection to the existing one. Hillside or unusual soils may require soils or geology reports.
Who issues the permit
Inside the City of Los Angeles, building permits come from the Department of Building and Safety (LADBS). Cities such as Santa Monica, Culver City, Calabasas and Manhattan Beach, and unincorporated LA County, run their own building departments with their own rules and review times. We work with whichever one governs your address.
Fees on new square footage
Added floor area can trigger fees beyond the permit itself, such as school district fees. We identify these early so they are in the budget.
Extra layers of review
Some properties sit in a hillside area, a coastal zone, a historic preservation overlay or a very high fire hazard severity zone, or are subject to HOA approval. Each can add requirements or review steps, so we check your address for them at the start rather than discovering them mid-design.

General information only. Requirements change and vary by city and property; we confirm what applies to yours during design.

Home Additions: common questions.

What is the difference between a room addition and a home addition?

Mostly wording. A room addition usually means one new room, such as a bedroom, family room or primary suite, built out from the house. A home addition can also mean a larger expansion or a full second story. Both go through the same zoning review, engineering and permits.

Is a second story or a ground-floor room addition better?

A ground-floor addition uses yard space and is usually simpler to build while you live at home. A second story keeps the yard but needs more structure below and a new stair. Your lot's setbacks, floor-area limits and foundations often decide it; our second story vs ground-floor addition guide compares the two.

Will an addition need new foundations?

Usually yes for ground-floor additions, and second stories often need reinforced footings. Our engineers assess this at the start.

How do you match the existing house?

We study the original structure, rooflines and materials so the new space feels like it was always part of the home.

How big can my addition be?

It depends on your lot's zoning: setbacks, height limits and floor-area rules. We check these during the consultation so design starts from what is actually allowed.

Can we stay in the house while you add a second story?

Sometimes, but a second story usually means opening the roof and working above occupied rooms. We will talk through the sequence honestly and recommend what makes sense for your family.

Should we build an addition or an ADU?

An addition expands your home; an ADU is a separate dwelling with its own entrance, kitchen and bathroom. The rules, permits and long-term uses differ, and we can compare both on your lot.

Do I need a soils report?

Many additions do, particularly on hillsides or where new foundations are involved. The building department and your structural engineer determine the requirement, and we coordinate it.

Guides for planning your home addition.

Planning your home addition?

What happens next

  1. 1Call or send the form
  2. 2Consultation & site visit
  3. 3A fixed, line-item proposal