RODO Development Inc. — Remodeling & Custom Homes
Black-glass garden sauna with circular windows and a yellow door beneath a mature tree hung with pendant lights, Woodrow Wilson Residence

ADU builder in Los Angeles: guest houses & garage conversions

Detached ADUs, garage conversions and attached units: designed for rental income, family or guests, and delivered turnkey.

For homeowners who want more from their property: a home for family, a place for guests, or a source of rental income.

  • Aging parents or adult children who want independence close by
  • A guest house, studio or home office separate from the main house
  • A rental unit on a lot you already own
  • An underused garage that could become living space

One garage, four ways to live in it.

A typical two-car garage is about 400 square feet. Swipe through four layouts, tell us who it's for, and your picks come with your message when you contact us.

Illustrative overhead view of a two-car garage converted into a one-bedroom ADU with a bath, galley kitchen and living room
1 / 4 · One bedroom
Concept render of a 20 × 20 ft two-car garage, not a RODO project. What you can build depends on your property's zoning, the garage's size and structure, and your city's rules.
Layout

A closed bedroom and a full bath at the back, an open kitchen and living room facing the garden.

  • Queen bedroom with a closet
  • Bath with a walk-in shower
  • Galley kitchen and dining for two
  • Glass doors where the garage door was
Who it's for

Have a garage that could be more? Send this layout with your project details and we'll come to the first visit knowing what you have in mind.

Send this layout to RODO

For illustration only. The images in this studio are computer-generated concepts, not photos of RODO projects. They are not a design, a plan, a quote or a promise of what can be built. What is possible on your property depends on its conditions, zoning and building code, and is set out only in a signed scope of work.

What an ADU can look like.

A detached guest house, a converted garage, and the rooms inside. These are concept renders to help you picture the possibilities, not photographs of RODO projects.

Concept render of a detached ADU guest house with white plaster walls, cedar siding and glass doors opening to a garden patio
Detached guest house · concept render
Concept render of a two-car garage converted into an ADU, with black-framed glass doors where the garage door was
Garage conversion · concept render
Concept render of an ADU studio interior with a white oak kitchen, vaulted beamed ceiling and glass doors to the garden
Studio interior · concept render
Concept render of an ADU bathroom with a curbless walk-in shower, zellige tile and a floating oak vanity
Bathroom · concept render

Everything on this page is a concept. What you can build depends on your property's zoning, lot size, setbacks, utilities and your city's ADU rules, and every design is subject to plan check and permits. We review your address and confirm what it allows before design begins.

What your ADU includes.

01

Feasibility & lot review

Setbacks, access, utilities, slope and any overlays reviewed before design, so you know what your lot supports.

02

Detached ADUs

Freestanding guest houses designed to complement the main home and the garden around them.

03

Attached ADUs

Units connected to the house with their own entrance, kitchen and bathroom.

04

Garage conversions

Turning an existing garage into a permitted, comfortable dwelling.

05

Junior ADUs

Smaller units created within the footprint of the existing home, where they fit your plans.

06

Utility connections

Water, sewer, electrical and gas service planned and connected.

07

Turnkey finishes

Kitchen, bathroom, flooring, lighting and exterior finished to move-in condition.

What makes it an ADU.

Under California law an ADU is a complete, independent home, so the code asks for the same basics as any dwelling. What you can build, and where, depends on your property's zoning, your lot and your city's rules. We confirm all of it for your address before design starts.

LA ADU rules guide
A kitchen
Permanent cooking facilities: a cooking appliance, a sink, a food-preparation counter and storage. A wet bar or a microwave on a shelf doesn't make a unit an ADU.
A bathroom
Its own toilet, sink and a shower or tub. A junior ADU inside the main house is the exception: it may share a bathroom with the house.
Room to live and sleep
Permanent space for living and sleeping. A studio counts, and sleeping rooms need an emergency escape window or door.
Its own entrance
A separate exterior entrance, so the unit works independently of the main house.
Life-safety basics
Smoke and carbon monoxide alarms, heating, ventilation and code-compliant electrical, as in any new home.
Energy code
California's energy code applies. Newly built detached ADUs generally need solar; conversions of existing space generally don't.
Junior ADUs
Up to 500 square feet within the house, with at least an efficiency kitchen. They come with their own owner-occupancy and deed rules, which we confirm with your city.

A garage that becomes a home.

Converting a garage is often the quickest route to an ADU, because the footprint, roof and setbacks already exist. What decides it is what the old structure can carry and what it takes to bring it up to code as a dwelling.

Garage conversion guide
Parking
State law does not require you to replace the parking when a garage becomes an ADU. Local rules on driveways and curb cuts can still apply, and we confirm them for your address.
Setbacks
A converted structure can generally keep the setbacks it already has, even where a new building would need to sit farther from the property line.
Slab and walls
We check the slab, footings and framing first. Older garage slabs often need trenching for plumbing, and walls need insulation, new openings and sometimes reinforcement.
Plumbing and power
A kitchen and bathroom mean new drain lines to the sewer, water supply and usually a panel upgrade or subpanel. Distance to the main lines matters more than the size of the room.
Energy code
As a dwelling, the unit must meet California's energy code: insulation, windows, ventilation and the systems that heat and cool it.

A second small house on your lot.

A detached ADU or guest house gives the most freedom: its own entrance, its own garden, its own design. State law sets a floor under what cities may allow, and your city's ordinance fills in the rest.

LA ADU rules guide
Size
Cities may not cap an ADU below 850 square feet for a studio or one bedroom, or 1,000 square feet for two or more. Many allow a detached unit up to 1,200 square feet.
Height
State law guarantees at least 16 feet for a single-story detached ADU, with more allowed near transit and for units attached to the house. Some cities allow two-story units.
Placement
New detached ADUs generally need at least 4 feet from the side and rear property lines. Trees, slope, easements and fire access decide where it actually fits.
Utilities and safety
Sewer, water and power are planned from the start. State law says an ADU does not need fire sprinklers unless the main house does, though hillside lots in a very high fire hazard zone have faced extra conditions.
Fees
Under state law, ADUs of 750 square feet or less are exempt from impact fees; larger units pay fees in proportion to the main house.

Prefab or built on site?

Prefab ADUs are built in a factory and set on the lot, and they can make sense on a flat, open lot. We build on site, and we'll walk you through how the two compare on your property before you choose.

ADU cost guide
What prefab still needs
A factory unit still needs plans, permits, a foundation, utility connections and inspections on site. That part of the project is the same either way.
Access
Delivery usually takes a truck and a crane. Narrow hillside streets, overhead lines and tight side yards can rule it out or add cost.
Design fit
Site-built units are designed to your lot and to match the main house in rooflines, materials and windows. Prefab offers set models with limited changes.
Odd lots
Slopes, irregular footprints and garage conversions are where building on site usually wins.

Six steps, one accountable team.

  1. 01

    Consultation & site visit

    We walk the lot with you, discuss how the ADU will be used, and look at access, utilities and where a unit could sit.

  2. 02

    Design & engineering

    Design and engineering are developed together, including utility routing and any site work.

  3. 03

    Permits

    ADUs are approved through a ministerial process under California law, but they still need full building permits. We prepare and submit plans and respond to plan check.

  4. 04

    Fixed proposal

    A fixed, line-item proposal covers site work, utilities, construction and finishes.

  5. 05

    Build

    Foundations, framing, systems and finishes, with your project manager coordinating inspections and weekly updates.

  6. 06

    Walkthrough & warranty

    Final inspection and sign-off, a walkthrough of the finished unit, documentation and warranty information.

Our full process

What shapes the budget and the schedule.

Every property and every brief is different, so we do not publish price lists or generic timelines. These are the factors that matter most. Your fixed proposal confirms the price and an estimated schedule before work begins.

Any schedule or timeline we discuss is an estimate. The actual timeline depends on the final scope of work, design decisions, permits and inspections, and material availability.

What affects cost

Type of ADU
A garage conversion, attached unit and new detached guest house each start from a different point.
Size and layout
Square footage, number of bedrooms and bathrooms, and ceiling heights.
Utility runs
Distance to sewer, water and power, and whether the electrical service needs an upgrade.
Site conditions
Slope, trees, access for equipment and any retaining walls or drainage work.
Fire and safety requirements
Some lots require fire sprinklers or other measures, depending on location and access.
Finish level
From durable rental-ready finishes to a guest house that matches the main home.

What affects the timeline

Feasibility answers
Utility capacity and site constraints are confirmed before design is finalized.
Plan check
Review times vary between cities and with the completeness of the submission.
Utility coordination
New or upgraded service from the utility provider runs on its own schedule.
Lead times
Windows, cabinetry and fixtures are ordered early.

Permits in Los Angeles, explained.

California has made ADUs far easier to approve, but they are still permitted, inspected dwellings, and local standards apply.

State law
On most lots with a single-family home, cities must allow an ADU that meets objective standards, and approval is ministerial, without a public hearing.
Local standards still apply
Height, setbacks, size, fire access and design standards vary by city. State law limits parking requirements for many ADUs, including garage conversions and units near transit.
Who issues the permit
Inside the City of Los Angeles, building permits come from the Department of Building and Safety (LADBS). Cities such as Santa Monica, Culver City, Calabasas and Manhattan Beach, and unincorporated LA County, run their own building departments with their own rules and review times. We work with whichever one governs your address.
Pre-approved plans
The City of Los Angeles offers a pre-approved ADU standard plan program. Whether a standard plan or a custom design suits your lot and goals is something we evaluate with you.
Extra layers of review
Some properties sit in a hillside area, a coastal zone, a historic preservation overlay or a very high fire hazard severity zone, or are subject to HOA approval. Each can add requirements or review steps, so we check your address for them at the start rather than discovering them mid-design.

General information only. Requirements change and vary by city and property; we confirm what applies to yours during design.

ADUs: common questions.

Can I build an ADU on my lot?

Most Los Angeles single-family lots allow an ADU. We review your lot, setbacks and utilities before any design work.

Do you handle the permits?

Yes, we manage plan check and approvals with the city on your behalf.

Garage conversion or a new detached ADU?

A conversion reuses an existing structure and can be simpler; a new detached unit gives more freedom in size and design. We compare both on your property during the consultation.

Do I need to add parking?

Often not. State law removed parking requirements for many ADUs, including garage conversions and units near public transit. We confirm the rules for your address.

Will an ADU raise my property taxes?

In California, new construction is generally assessed on its own, so the value the ADU adds is assessed rather than your whole property. Confirm the specifics with the LA County Assessor.

Can I rent out my ADU?

Long-term rental is a common use. Short-term rental rules and any owner-occupancy requirements are set locally, so check your city's current rules before planning around them.

How big can an ADU be in Los Angeles?

State law protects at least 850 square feet for a studio or one bedroom and 1,000 for two or more, and many cities allow a detached ADU up to 1,200 square feet. Lot coverage, setbacks and your city's ordinance set the final limit.

How long does ADU approval take?

Once an application is complete, state law gives the city 60 days to approve or deny it. Corrections during plan check, and any coastal, hillside or fire-zone review, add time, so we submit complete, coordinated plans.

Is a prefab ADU a better deal?

Not automatically. A factory unit still needs a foundation, utility connections, permits and crane access, and design changes are limited. We compare a site-built unit with your options on your actual lot.

What does an ADU contractor do?

As a design-build ADU builder, we take the unit from lot review and design through engineering, permits, utilities and construction to the final inspection, with one team and one fixed proposal.

Planning your ADU?

What happens next

  1. 1Call or send the form
  2. 2Consultation & site visit
  3. 3A fixed, line-item proposal