IllustrationRebuilding your Altadena home
Altadena is unincorporated, so an Eaton Fire rebuild runs on Los Angeles County rules, not City of Los Angeles ones. This page explains the County's like-for-like path, what changes if you build larger, where to file, and how to stay on your land while the new house goes up.
The County's like-for-like path
The Eaton Fire destroyed 9,419 structures and damaged 1,076 more, according to CAL FIRE, most of them homes in Altadena. Los Angeles County defines a like-for-like rebuild as one of the same size, location and use as the home that was lost, and in the Eaton Fire area it may grow by up to 10 percent or 200 square feet, whichever is greater, in floor area, height or footprint. These rebuilds are exempt from current zoning standards and receive expedited review, but they must meet today's building and fire codes.
Owners have two years from the emergency declaration to apply, with up to three one-year extensions. The County also requires rebuilt homes to be electric-ready and solar-ready, though gas service remains allowed, and to include fire sprinklers; wood-burning fireplaces are permitted for fire rebuilds. Permit fee waivers apply to owners who owned and lived in the home before January 7, 2025.
Building larger: the Altadena Community Standards District
Go beyond the like-for-like allowance and the project must meet current zoning, including the Altadena Community Standards District, which keeps houses in scale with their blocks. Its standards include a front setback of 20 feet or the shallowest legal front yard on the block, a rear setback of 25 feet (35 on lots of 20,000 square feet or more), side yards of ten percent of lot width with a five-foot minimum, and a height limit of 30 feet (35 on the larger lots), with no more than two stories and 23 feet within 15 feet of a property line.
Those numbers can reshape a plan: a second story that fits on paper may need to step back from the side lines. We test the house you want against both paths, so you can decide whether the extra space is worth the change in review.
Plans, permits and the Altadena center
The County runs a One-Stop Permit Center in Altadena at 464 West Woodbury Road, Suite 210, with Building & Safety and Regional Planning staff for fire recovery, and applications can be filed online through EPIC-LA. Plans can be prepared while debris removal finishes, but the County issues the building permit only after debris removal is complete.
The County also offers pre-approved standard house plans, some prepared specifically for the Eaton Fire area; you still provide a site plan for your lot. A standard plan can save design time, while a custom design can respond to your lot, your trees and the architecture of your street. Altadena's Craftsman, Spanish Revival and mid-century houses gave the town its character, and many owners want the new home to belong to that tradition rather than to a catalogue.
Living on the lot, and building to resist the next fire
During the rebuild, the County allows a recreational vehicle, manufactured home or mobilehome on the property with water, sewer and power hookups, for two years from the emergency declaration with up to three one-year extensions; it must leave within 30 days of the new home's certificate of occupancy, and buyers who purchased after the fire are not eligible. A household may also live in a stand-alone ADU built during the rebuild until January 7, 2030. Building the ADU first is a strategy some families use to get home sooner.
Only part of Altadena lies in the State's high fire hazard zones, where the 2025 California Wildland-Urban Interface Code applies, but we recommend building to its standards across the town: Class A roofing, ember-resistant vents, ignition-resistant exterior walls, tempered glazing and noncombustible materials in the first five feet around the house. The difference in cost is small when it is designed in from the start.
General information, checked against official sources in October 2026. Rules change and vary by parcel; we confirm what applies to your property before design begins.
Recent RODO projects
Completed projects in and around Los Angeles; each is labelled with where it was built.
Fire rebuilds in Altadena: common questions
What is a like-for-like rebuild in Altadena?
A rebuild of the same size, location and use as the lost home, which in the Eaton Fire area may grow by up to 10 percent or 200 square feet, whichever is greater. It is exempt from current zoning but must meet current building and fire codes.
What applies if I rebuild larger?
The project must meet current zoning, including the Altadena Community Standards District's setbacks, height limits and two-story maximum, which can change the design and the review path.
Where do I apply for a rebuild permit?
At the County's Altadena One-Stop Permit Center, 464 W. Woodbury Rd., Suite 210, or online through EPIC-LA. The permit is issued after debris removal is complete.
Can I live on my property while the house is rebuilt?
Yes, in an RV, manufactured home or mobilehome with utility hookups, within the County's time limits. A household may also live in an ADU built during the rebuild until January 7, 2030.
Does the rebuilt home need fire sprinklers?
Yes. The County requires sprinklers in fire rebuilds, along with electric-ready and solar-ready construction.
Keep reading
Custom Homes elsewhere in Los Angeles
General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design.
Custom Homes in Altadena?
What happens next
- 1Call or send the form
- 2Consultation & site visit
- 3A fixed, line-item proposal
- License
- CA License #1100805 · Bonded & insured








