IllustrationNew home construction in Bel Air
Building a new house in Bel Air means building on a slope, on a road laid out a century ago, inside one of the most regulated construction districts in Los Angeles. This page covers the rules that set the size of the house, the ones that decide whether the street can serve it, and how we plan a build around both.
The envelope on an estate lot
Most Bel Air parcels lie in the City's Hillside Area and are zoned for single-family estates, so the Baseline Hillside Ordinance sets the envelope a new house has to fit. Height is measured straight up from the slope beneath each part of the house, so the limit follows the hill. On RE11 and larger lots in the most common height districts, it is 36 feet where the top roof has a slope of 25 percent or more and 30 feet where it is flatter; on smaller lots it is 33 and 28. A Zoning Administrator can approve more, but not beyond 45 feet from the lowest point beside the walls to the top of the roof.
Buildings more than six feet above natural grade can cover no more than 40 percent of the lot. Grading is limited to 500 cubic yards plus five percent of the lot area, up to a by-right ceiling that rises with the zone, from 1,200 cubic yards on RE9 lots to 3,300 on RE40 lots, and without further approval a site may import no more than 500 cubic yards and export no more than 1,000. We run these numbers on a topographic survey before an architect commits to a plan, because a basement or a lower terrace can use up the allowance quickly.
Whether the street can serve the house
Bel Air's roads were laid out in the 1920s to follow the hills, and many are narrower than today's standards. The City calls a hillside street less than 36 feet wide, with less than 28 feet of paving, a Substandard Hillside Limited Street. On one, a new house cannot receive a building or grading permit until half the street width along the frontage is dedicated to standard dimensions, or to a lesser width set by the City Engineer. The house also needs extra off-street parking: one more space for each 1,000 square feet above 2,400, up to five spaces in all.
A second test looks past your frontage. If the route from your driveway to the edge of the Hillside Area lacks a continuous paved roadway at least 20 feet wide, a new house needs a Zoning Administrator's approval before permits are issued. This is a different rule from the street-width condition on ADUs, and on some Bel Air streets it shapes the project more than anything in the design. The Bureau of Engineering decides the street classification, and we ask for that determination first.
Building inside the construction district
Since March 2017 the Bel Air–Beverly Crest community plan area has been a Hillside Construction Regulation district, the first in the City. On site, that means weekday work between 8 a.m. and 6 p.m., interior work only on Saturdays, earth hauled in limited hours and truck sizes, and a ceiling of 6,000 cubic yards for all import and export on one property. A project that moves more than 1,000 cubic yards of earth also goes to a haul route hearing.
For a new estate house those rules decide the order of work: how a basement is excavated, when concrete is poured and where materials are staged off a single narrow road. We plan that sequence with the structural and geotechnical engineers before we price the job, because on these sites the foundations, retaining walls and drainage are a large part of the house you never see.
Fire, trees and the project team
The 1961 Bel Air Fire is why Los Angeles drew its mountain fire district, and much of Bel Air is still a Very High Fire Hazard Severity Zone. Since January 2026 a new house there is built under California's Wildland-Urban Interface Code, which governs the roof covering, attic and eave vents, siding, glazing and decks. We also design the ground around the house: hard surfaces against the walls, no wood fence tied into the building and planting kept back from it. The City also protects native oaks, sycamores, bay and walnut trees from a small trunk size upward, and on a mature estate the best site plan keeps them.
A new Bel Air house is usually a team effort from the first survey: the owner's architect, a structural engineer, a geotechnical engineer and often a landscape architect, with us pricing and sequencing the work alongside them. Owners without a designer can have one through our own team. Bel Air is not yet among the places we have built; the hillside projects on our site are two complete renovations in the Hollywood Hills, the Woodrow Wilson and Rodgerton Dr. residences. The proposal you sign is fixed and broken into line items, and a single project manager reports to you with weekly updates.
General information, checked against official sources in October 2026. Rules change and vary by parcel; we confirm what applies to your property before design begins.
Recent RODO projects
Completed projects in and around Los Angeles; each is labelled with where it was built.
New homes in Bel Air: common questions
How tall can a new house be in Bel Air?
On RE11 and larger hillside lots in the most common height districts, 36 feet if the top roof is pitched at 25 percent or steeper and 30 feet if it is flatter, measured from the slope below. Some height districts set lower limits, so we confirm yours on ZIMAS.
What is a Substandard Hillside Limited Street?
A hillside street less than 36 feet wide with less than 28 feet of paving. Building a new house on one brings a street dedication along your frontage and extra off-street parking as the house grows past 2,400 square feet.
What if the road to my lot is narrower than 20 feet?
If there is no continuous 20-foot paved roadway from your driveway to the edge of the Hillside Area, a new house needs a Zoning Administrator's approval before building and grading permits are issued.
How much grading can a new Bel Air house have?
By right, 500 cubic yards plus five percent of the lot area, up to a ceiling set by zone, such as 3,300 cubic yards on RE40 lots. In the construction district, earth brought in and taken out cannot total more than 6,000 cubic yards, and moving over 1,000 cubic yards means a haul route hearing.
Who decides whether my street is substandard?
The City's Bureau of Engineering. LADBS issues a Hillside Referral Form, Bureau of Engineering staff complete it for your frontage, and the answer sets the dedication, parking and grading rules for the new house. We request it before design.
Keep reading
General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design.
Custom Homes in Bel Air?
What happens next
- 1Call or send the form
- 2Consultation & site visit
- 3A fixed, line-item proposal
- License
- CA License #1100805 · Bonded & insured








