RODO Development Inc. — Remodeling & Custom Homes
Modern custom home at golden hour (illustrative)
Illustration

Custom homes in the Hollywood Hills

Three of the projects on our site are in the Hollywood Hills: renovations on Woodrow Wilson Drive, on Rodgerton Drive and in Beachwood Canyon. A new house here faces the same hills and the same streets under stricter rules, because it has to meet today's hillside code in full. This page explains those rules and how they shape a design.

The hillside envelope

Most lots above Hollywood are in the City's Hillside Area, where the Baseline Hillside Ordinance governs new houses. Height is measured as an envelope that follows the slope. On R1 and RS lots in the most common height districts, the limit is 33 feet where the top roof slopes 25 percent or more and 28 feet where it is flatter; some parcels sit in height districts with lower limits, which ZIMAS shows. A Zoning Administrator can allow more height, but never beyond 45 feet overall.

Buildings more than six feet above grade may cover up to 40 percent of the lot, or 45 percent on a lot narrower than 50 feet and smaller than 5,000 square feet, which describes many older parcels here. One rule can work in an owner's favor: where at least 40 percent of the houses on both sides of the block already exceed the height limit, a new house may reach the average height of those taller homes.

Building on a narrow street

Many streets in the hills have less than 28 feet of paving within a right of way under 36 feet, which the City calls a Substandard Hillside Limited Street. On one, the front yard can be as shallow as five feet, which helps on a lot that drops away from the road, but any part of the house within 20 feet of the front lot line is limited to 24 feet in height. A new house there also brings a street dedication along the frontage and extra off-street parking as the floor area grows, and earth import and export limits are lower than on wider streets.

Every new house here starts with a plan for the street itself: delivery times, where a concrete pump can stand, crew parking away from the curb and trucks sized for the bends. When excavation will send more than 1,000 cubic yards of soil through these streets, the City holds a haul route hearing first. The citywide noise rules give builders long weekday hours and a shorter Saturday, but some hillside neighborhoods follow tighter limits, described below.

Construction districts, Mulholland and the 2025 fires

In 2018 the City extended its Hillside Construction Regulation rules to the Bird Streets and Laurel Canyon. There, a job site opens at 8 a.m. and closes at 6 p.m. on weekdays, Saturday work must stay inside the building and floodlights after 6 p.m. are not allowed. Closer to Mulholland Drive, a parcel may sit within the Mulholland Scenic Parkway Specific Plan, and a new house there is reviewed for its design and visibility from the parkway. We check both overlays on ZIMAS before design.

On January 8, 2025, the Sunset Fire started near Runyon Canyon and forced evacuations across the hills between Laurel Canyon Boulevard and the 101 before firefighters stopped it. Large parts of the hills carry the State's highest fire hazard rating, and a new house in them is built to the 2025 California Wildland-Urban Interface Code, in force since January 2026: an ember-resistant roof and vents, ignition-resistant walls and decks, and tempered or multi-pane glass. Brush clearance around the house continues every year after it is finished.

What our renovations here taught us

Our three Hollywood Hills projects are renovations, not new houses, but they were built on the same kind of site: the Woodrow Wilson Residence with designer OME DEZIN, the Rodgerton Dr. Residence with Henrybuilt cabinetry and walnut stairs, and a full renovation of a mixed-use property in Beachwood Canyon. Each one was planned around access first, and each taught us how much of a hillside job happens below the finished floor.

For a new house we start with a topographic survey, soils and geology reports and a ZIMAS check of the height district, street classification and overlays, then design with your architect or with our own team. Before anything is built you have an itemized, fixed price, and from excavation to final inspection one project manager sends weekly updates.

General information, checked against official sources in October 2026. Rules change and vary by parcel; we confirm what applies to your property before design begins.

Recent RODO projects

Completed projects in and around Los Angeles; each is labelled with where it was built.

Custom homes in the Hollywood Hills: common questions

How tall can a new house be in the Hollywood Hills?

On R1 and RS hillside lots in the most common height districts, 33 feet if the top roof is pitched at 25 percent or steeper and 28 feet if it is flatter, measured from the slope below. Some lots are in height districts with lower limits, so we confirm yours on ZIMAS.

What changes if my lot is on a narrow street?

On a Substandard Hillside Limited Street the front yard can be five feet, but the house is limited to 24 feet within 20 feet of the front lot line, and the project brings a street dedication, extra parking and lower earth import and export limits.

Is my lot in the Hillside Construction Regulation district?

The Bird Streets and Laurel Canyon have been in it since 2018, with weekday hours of 8 a.m. to 6 p.m. and interior-only work on Saturdays. Other parts of the hills are not, so we check your parcel on ZIMAS.

Have you built a new house in the Hollywood Hills?

Not yet. Our three projects here are renovations: the Woodrow Wilson Residence, the Rodgerton Dr. Residence and a mixed-use property in Beachwood Canyon, all shown with photographs on our projects page.

Should we renovate our hillside house or build new?

A renovation can often keep setbacks or floor area that today's hillside rules would not allow. A new house has to meet those rules in full, but lets the foundation, structure and plan be designed together. We compare both for your lot.

General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design.

Custom Homes in Hollywood Hills?

What happens next

  1. 1Call or send the form
  2. 2Consultation & site visit
  3. 3A fixed, line-item proposal