Rebuilding After the Fires in Altadena and the Palisades

Rebuilding after the January 2025 fires: LA County and City of LA processes, like-for-like or redesign, fire-resistant construction and insurance records.

By , Founder & CEO

Published · Updated

The January 2025 fires took thousands of homes in Altadena, Pacific Palisades and the communities around them. Many owners are now somewhere in the middle of the rebuild: lots cleared, insurance partly settled, decisions still open. Others are only now ready to start. This guide is for both. It describes the official processes as the agencies have published them at the time of writing, with links to the agencies that run them, and the practical decisions a rebuild involves.

One caveat up front. Recovery rules have changed many times since the fires and continue to change. Treat this as orientation and confirm the current pathway for your parcel with the agency or with us before you commit to a design.

First: which agency handles your rebuild

  • Altadena is unincorporated LA County. Rebuilds are reviewed by LA County Planning, Building and Safety, Fire and Public Health, coordinated through the County’s rebuilding program.
  • Pacific Palisades is part of the City of Los Angeles. LADBS issues building permits, with City Planning involved where required. Parts of the neighborhood are in the California Coastal Zone.
  • Malibu homes lost to the Palisades Fire are permitted by the City of Malibu, and some fire-affected homes elsewhere sit in unincorporated county areas.
  • Pasadena neighborhoods that burned in the Eaton Fire are permitted by the City of Pasadena.

The rest of this guide focuses on Altadena and the Palisades, where most homes were lost.

Before plans: clearing the lot and knowing the site

In LA County, permits are not issued until hazardous-material removal (Phase 1, handled by the U.S. EPA) and debris removal (Phase 2, through the government program or an approved private contractor) are complete, according to the County’s like-for-like rebuild page. In the City, confirm the current debris-removal and clearance requirements with LADBS before you plan around a start date.

Before design, a rebuild also needs a current survey, often a soils report (especially on Palisades hillside and bluff lots), and a check on utility service. Old foundations, retaining walls and site walls that survived the fire have to be evaluated before anyone decides to reuse them.

Like-for-like or redesign

This is the biggest early decision, and it’s personal. Some families want the house they had back, as quickly as possible. Others want to use the moment to build something different. Both are reasonable.

Altadena: LA County rules

LA County defines a like-for-like rebuild as one with the same size, location and use as the previous structure; it can be smaller or have a different floor plan. In the Eaton Fire area, a like-for-like replacement can increase floor area, size, height or footprint by up to 10 percent or 200 square feet, whichever is greater. Like-for-like structures don’t have to comply with current zoning standards, but they must meet current Building, Fire and Health and Safety codes.

A rebuild beyond those limits is subject to current zoning, including the Altadena Community Standards District, with a 20-foot minimum front yard setback for all non-like-for-like rebuilds, per the County. The County also offers one-stop permit centers, pre-approved plans, a self-certification option and fee deferrals and refunds; each has its own eligibility rules.

Pacific Palisades: City of LA rules

In the City, Mayor Bass’s Emergency Executive Order 1 created a like-for-like option for properties damaged or destroyed by the Palisades Fire. It allows up to a 10 percent increase in the previous building’s height and footprint, lets non-conforming setbacks remain, and exempts eligible projects from discretionary planning review. City guidance says an attached garage of up to 400 square feet and one story does not count toward the 10 percent footprint increase. Projects that go beyond 110 percent can still be built, through standard review under current zoning. A separate order, Emergency Executive Order 8, created a zoning-compliant rebuild option for single-family homes in the Coastal Zone.

EO1 also set up the City’s One-Stop Rebuilding Center in West LA, at 1828 Sawtelle Blvd; check its current hours and services before you go. On fees, LADBS has published a fee waiver and refund guide for Ordinance 188985, which waives many permit and clearance fees for rebuilds up to 110 percent of the damaged structure’s area, for the owner at the time of the fires, unless the property is sold before the certificate of occupancy.

How to decide

  • Like-for-like generally means faster approval and fewer zoning questions.
  • A redesign can fix what never worked in the old house, but it is reviewed against current zoning, which may allow less, not more, on some lots.
  • Either way, the new house is built to today’s codes, so a like-for-like rebuild is not a copy of the old construction.
  • Insurance settlement terms, budget and how soon you need to be home all weigh on the choice.

Altadena rebuild permits: the steps

LA County lays out the road to rebuilding in six steps: debris removal, preparing plans, starting the permit application, the permit process, construction and inspection, and moving in. Here’s what each one involves in practice for an Altadena lot.

  1. Debris removal and site clearance. Phase 1 (hazardous materials, handled by the U.S. EPA) and Phase 2 (fire debris, through the Army Corps of Engineers or an approved private contractor) have to be finished. The County accepts applications before then, but per its like-for-like page, building permits aren’t issued until site clearance is complete.
  2. Prepare plans. A California-licensed architect or engineer may be required, and plans must meet the current LA County Building Codes. The County offers pre-approved plans with a shorter, more predictable review. Lots on septic need an evaluation, and building anything other than the original permitted structure may require soil testing and a new onsite wastewater design. Under a pilot program, registered architects and engineers can also self-certify that plans meet the County building code (guide updated March 23, 2026).
  3. Start the permit application. Online through EPIC-LA or in person at the Altadena One-Stop Permit Center, 464 W. Woodbury Road, Suite 210, where Public Works, Regional Planning, Public Health and Fire are represented.
  4. Permit process. Per the County’s permit process page, Public Works, Fire and Public Health commit to reviewing residential plans within 10 business days for the first review and 5 business days for later reviews. Clearances come before the permit: Fire review for sprinklers (which can be deferred until after issuance) and fuel modification plans in mapped high fire hazard areas, Public Health for septic, an SCE application number, proof of a water source, and SoCalGas reinstatement. School fees apply only where the rebuild adds more than 500 square feet to what was permitted before.
  5. Construct and inspect. Your contractor schedules inspections at each stage, from foundation through final.
  6. Move in. Once final inspection passes and the last clearances are signed, the County issues the certificate of occupancy.

Palisades rebuild permits

In the City of Los Angeles, Palisades rebuilds are permitted by LADBS. Besides the like-for-like path under Emergency Executive Order 1, the Mayor’s Emergency Executive Order 6 (April 2025) created the City’s first plan check self-certification pilot: for eligible single-family rebuilds, a licensed architect certifies that the plans meet code, and LADBS issues the permit without its own plan check. Inspections and other departments’ requirements still apply, as LAist reported. Fee relief started with Executive Order 7 and was later set by Ordinance 188985, described above. Unincorporated County parcels affected by the Palisades Fire use the County’s Calabasas One-Stop Permit Center, and Malibu permits its own homes.

A state order sits on top of the local process. The Governor’s Executive Order N-4-25 (January 12, 2025) suspended CEQA and the Coastal Act for rebuilds in substantially the same location that don’t exceed 110 percent of the footprint and height of the legally established structure.

How long rebuilding takes: what sets the pace

Everyone asks this, and we understand why. We still don’t give a number before we know the lot, because the waits come from specific places and they differ from one property to the next. These are the ones we see:

  • Site clearance. No permit issues until debris removal is signed off.
  • The path you choose. Like-for-like skips most zoning questions. A redesign is reviewed against current zoning, including the Altadena Community Standards District or the City’s single-family and coastal rules.
  • Correction rounds. The County’s review commitments apply per round. A complete, well-coordinated first submission saves more time than anything else in the design phase.
  • Clearances. Fire flow and hydrants, fuel modification, septic or sewer, and utility applications can each hold up a permit that’s otherwise ready.
  • The site itself. Hillside soils, retaining walls and whether the old foundation can be reused all need an engineer’s answer before plans are final.
  • Insurance and financing. Design decisions often wait on the settlement, and the settlement often waits on a detailed estimate.
  • Construction demand. With thousands of homes rebuilding at once, crews, inspections and fire-rated products like windows and vents can have longer lead times than usual.

Pre-approved plans and self-certification can shorten plan review. They don’t shorten construction. The fastest rebuilds we see are the ones where design, engineering, utilities and insurance move in parallel instead of one after another, which is exactly what a design-build team is for.

Building to current fire codes

Every rebuild in a fire hazard severity zone must meet California’s wildfire construction standards. For years these lived in Chapter 7A of the Building Code; from January 1, 2026 they are consolidated in the California Wildland-Urban Interface Code. Which code edition applies to your rebuild depends on when your plans are submitted, which is worth confirming with your designer.

In practice, that means:

  • Class A roof assemblies and ember-resistant vents.
  • Noncombustible or ignition-resistant exterior walls and protected eaves.
  • Dual-pane windows with at least one tempered pane, or other rated glazing.
  • Decks and attached structures built from materials rated for the exposure.
  • Landscape planned for defensible space, keeping the area closest to the house clear of combustible material.

These are minimums. Some owners go further, with noncombustible decking, metal or tile roofs, fewer exposed gutters and enclosed eaves. We talk through where those choices matter most on your site.

Insurance documentation: practical habits

We are builders, not insurance advisors, and nothing here replaces advice from your insurer, a public adjuster or an attorney. The California Department of Insurance publishes top tips for wildfire claimants. The habits that matter most for the construction side:

  • Request a complete copy of your policy and declarations page. The insurer has to provide it.
  • Understand each limit: dwelling, other structures, contents and additional living expenses, plus extended replacement cost and building code upgrade coverage if your policy has them. Code upgrades matter because the rebuild must meet current codes.
  • Get at least one detailed, licensed contractor’s estimate to compare against your limits.
  • Keep a claim diary of every conversation, and keep receipts for every additional living expense.
  • Ask your insurer how the timelines for collecting full replacement cost and living expenses apply to you, since California law has specific rules after a declared disaster.

A line-item construction estimate is useful here. It shows the adjuster exactly what the rebuild includes, and where code requirements add cost the original house didn’t carry.

How design-build helps a rebuild

A rebuild has many moving parts: survey, soils, design, engineering, agency review, insurance, utility reconnection, and construction. In a design-build process one team carries all of them, with one point of contact.

  • Design and cost develop together, so the plans match your settlement and budget instead of being priced after they’re finished.
  • You receive a fixed, line-item proposal before construction, with allowances clearly labelled, which you can share with your insurer.
  • A dedicated project manager coordinates inspections and sends weekly updates.

We are a licensed general contractor (CSLB #1100805, Class B), bonded and insured. We don’t promise faster permits than the agencies deliver. We promise to keep your project organized, documented and moving.

Where to go next

Our new construction page explains how we build ground-up homes, including rebuilds. If your lot is on a slope, read building on a hillside in Los Angeles. And if you would like someone to walk the lot with you and talk through like-for-like versus redesign, contact us. There’s no pressure in that conversation, and no obligation.

General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design. Any schedule or timeline we discuss is an estimate. The actual timeline depends on the final scope of work, design decisions, permits and inspections, and material availability.

Common questions

Who issues rebuild permits in Altadena?

Altadena is unincorporated Los Angeles County, so rebuilds are reviewed by LA County Planning, Building and Safety, Fire and Public Health through the County’s rebuilding program, with one-stop permit centers for fire recovery.

Who issues rebuild permits in Pacific Palisades?

Most of Pacific Palisades is in the City of Los Angeles, so LADBS issues building permits, with City Planning involved where required. Parts of the neighborhood are in the Coastal Zone, and fire-affected homes in Malibu are permitted by the City of Malibu.

What is a like-for-like rebuild?

A rebuild of the same size, location and use as the home that was lost. LA County allows Eaton Fire rebuilds to grow by up to 10 percent or 200 square feet, whichever is greater; the City of LA allows up to a 10 percent increase in height and footprint under Emergency Executive Order 1.

Can I build a bigger or different house instead?

Yes, but a rebuild beyond the like-for-like limits is reviewed against current zoning, such as the Altadena Community Standards District or the City of LA’s single-family and coastal rules, which can take longer and may limit size.

Does a like-for-like rebuild have to meet current codes?

Yes. Like-for-like relief applies to zoning, not to building and fire codes. Every rebuild must meet current codes, including California’s wildfire construction standards for roofing, vents, siding, windows and decks.

Are permit fees waived for fire rebuilds?

In the City of Los Angeles, Ordinance 188985 waives many permit and clearance fees for rebuilds up to 110 percent of the damaged structure’s area, for the owner at the time of the fires. LA County offers fee deferrals and refunds. Eligibility rules apply in both.

How do I get a rebuild permit in Altadena?

Once debris removal is complete, submit plans through EPIC-LA or at the Altadena One-Stop Permit Center at 464 W. Woodbury Road, Suite 210. Public Works, Fire and Public Health review the plans, other clearances are collected, and the County issues the building permit.

How long will it take to rebuild in Altadena?

It varies by lot. The County commits to a first plan review within 10 business days and later reviews within 5, but the overall pace depends on site clearance, like-for-like versus redesign, the number of correction rounds, clearances, soils, insurance and construction lead times.

What is the Altadena One-Stop Permit Center?

A County office for Eaton Fire rebuilds where Public Works, Regional Planning, Public Health and Fire staff help owners prepare plans, apply for permits, schedule inspections and reach a certificate of occupancy. Check the County’s recovery site for current hours and appointments.

Can a licensed architect self-certify a fire rebuild?

Yes, under pilot programs. LA County lets registered architects and engineers self-certify rebuild plans in unincorporated areas, and the City of LA’s Emergency Executive Order 6 created a self-certification pilot for eligible Palisades single-family rebuilds. Inspections and other department reviews still apply.

How do Palisades rebuild permits work?

Most of Pacific Palisades is in the City of Los Angeles, so LADBS issues the permits. Owners can use the like-for-like path under Emergency Executive Order 1, the self-certification pilot, or standard review for larger redesigns, with fee waivers under Ordinance 188985 for eligible rebuilds.