By Dolev Popovich, Founder & CEO
Published
Short answer: a whole-home remodel renovates the entire house as one project: layout and structural changes, new or upgraded electrical, plumbing and heating and cooling, kitchens and bathrooms, windows and doors, insulation, floors, millwork and finishes, plus the permits and inspections that come with them. Planning it as one job, rather than room by room, means walls get opened once, systems get replaced before finishes go in, and one contractor is responsible for the whole result.
The layers of a whole-house remodel
Think of it from the inside out.
Layout and structure. Taking out a wall between the kitchen and living room, adding a beam, moving a stair, raising a ceiling, reframing a room. Bearing walls need an engineer and a permit. On our Leescott Ave. remodel in Encino, the work included selective demolition and framing adjustments so the kitchen, dining and living areas could open into one another.
Electrical. New circuits for a modern kitchen, a panel upgrade if the old one can’t carry the load, lighting plans, and the wiring behind it. In a house built in the 1950s or 1960s, from Brentwood to Pasadena, this is often the first thing that has to change.
Plumbing. Supply and drain lines, especially where old galvanized or cast-iron pipe is still in the walls; new fixtures; and gas lines for ranges, fireplaces or pool equipment.
Heating and cooling. New ducts or a new system sized for the house as it’ll be, not as it was. Hot inland summers and new insulation both change the sizing, so it is rarely worth reusing the old equipment.
The envelope. Windows and doors, insulation where walls and ceilings are open, and sometimes the exterior: stucco, siding, roof. Our Ceilhunt Ave. project included a complete exterior with smooth stucco and composite wood siding alongside a roughly 600 square foot addition.
Kitchens and bathrooms. Usually the biggest single line items, and the rooms people picture first. Cabinetry, stone, tile, fixtures, appliances, ventilation and lighting.
Floors, millwork and finishes. Floors run through the house in one material instead of changing at every doorway. Then doors, trim, built-ins, plaster or paint.
Permits and inspections. Plan check before work starts, then inspections at each stage: foundation, framing, rough electrical and plumbing, insulation, final. Our guide to building permits in Los Angeles explains how it works.
What usually isn’t included (unless you add it)
Additions and second stories, ADUs, pools and the backyard are separate scopes. They can run alongside a whole-house remodel, and often should. Ocean Park in Santa Monica, for example, combined a complete renovation with a second-story addition. But they need their own design, engineering and permits, so name them in the scope from the start.
Why one project beats a string of small ones
Here’s what happens when it’s done room by room. The kitchen goes in this year. Next year the electrician needs to open the new kitchen wall to run a circuit for the bathroom. Then the floor stops at the hallway because the old flooring can’t be matched.
One project fixes the order: structure, then systems, then insulation and walls, then finishes. Each trade comes once. And there’s one contractor answerable for all of it, which matters more than it sounds when something goes wrong between two trades. Our process page shows how we sequence it.
What a good scope document lists
Before pricing, write it down. Every room, every system, every outdoor area that’s included, and what’s not. A loose scope is where change orders come from. Our renovation timeline guide shows how scope, design and permits come before construction, our whole-home remodel cost guide covers what drives the budget, and how design-build pricing works explains how that scope turns into a fixed proposal.
Not sure whether your project is a remodel or a renovation? See renovation vs. remodel. Wondering whether you can stay in the house? Our guide to living at home during a remodel covers both options.
Planning a whole-house remodel in Los Angeles? Call RODO Development Inc. at (818) 610-9680 or send us the address. We’ll walk the house with you and help you write the scope.
General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design. Any schedule or timeline we discuss is an estimate. The actual timeline depends on the final scope of work, design decisions, permits and inspections, and material availability.
Common questions
What is included in a whole-house remodel?
Layout and structural changes, electrical, plumbing and heating and cooling, insulation, windows and doors, kitchens and bathrooms, floors, millwork and finishes, plus the permits and inspections that go with them.
Do I need a permit for a whole-home remodel in Los Angeles?
Almost always. Structural changes, new electrical and plumbing and most layout changes need permits from LADBS in the City of Los Angeles, or from the local building department in cities such as Santa Monica, Beverly Hills and Calabasas.
Is a whole-home remodel the same as a renovation?
People use the words loosely. A renovation usually refreshes what’s there; a remodel changes layout or structure. A whole-home remodel often does both.
Can we live in the house during a whole-home remodel?
Sometimes, in phases, but most families move out for the main construction.