By Dolev Popovich, Founder & CEO
Published
Short answer: with design-build, the price firms up as the design does. Early conversations give a budget range at most. Once there are drawings, engineering and finish selections, the contractor prices every part of the job line by line and gives you a fixed proposal before construction starts. After that, the price only changes through a written change order that you approve, with its cost and schedule effect stated. At RODO Development Inc., that fixed, line-item proposal comes before construction begins, whether it’s a whole-home remodel or a custom home.
Why the first number is never the real number
Everyone wants a number on the first call. We get it.
But until there’s a design, nobody knows whether the wall comes out, whether the beam is steel or wood, whether the tile is from a big-box store or hand-made zellige. Those choices move the cost more than square footage does. So a builder who quotes a firm price on the first visit is either guessing or leaving room to make it up later. We don’t publish price lists for exactly that reason.
How the price takes shape in design-build
Here’s the order it happens in. Our process page walks through each phase in more detail.
- Site visit and scope. We walk the property and write down what’s in and what’s out.
- Design and engineering. Floor plans, structure and finish selections get drawn, and in design-build each choice gets checked against cost as it’s made. That’s the main advantage: you hear “that skylight adds structure” while it’s still a line on a drawing.
- Selections. Cabinets, stone, tile, fixtures, appliances. The more of these are chosen before pricing, the fewer allowances, and the firmer the number.
- The fixed, line-item proposal. Every trade and material, priced. Site work, demolition, framing, electrical, plumbing, HVAC, insulation, drywall, cabinetry, stone, tile, paint, permits. You sign it before construction starts.
- Construction, with change orders in writing. If you change something, or the house reveals something, it’s priced and you approve it before it’s built.
If you’re still deciding between one design-build team and hiring an architect first, our guide to design-build vs. architect and builder covers how pricing works under each.
Allowances: the line people skip
An allowance is a budget for something not yet selected. “Tile allowance” followed by an amount, for example. The question to ask is whether that amount buys the tile you actually want. A low allowance makes a proposal look cheaper and then comes back as a change order. Read every one.
Contingency
Old houses in Los Angeles hide things: galvanized pipe, undersized wiring, dry rot, past leaks. Many homeowners set aside 10 to 20 percent of the construction budget for what turns up once the walls are open. Agree in writing, before you sign, how the contingency gets used. It’s your money until it’s needed. Our whole-home remodel cost guide goes through what else moves the budget.
Comparing two proposals
Put them side by side, line by line. If one is much lower, look for:
- A missing trade (no HVAC line, no permit fees)
- Small allowances
- “By owner” items, like appliances you’ll buy yourself
- Vague lines: “finishes per plan” with no amount
The lower bid isn’t always cheaper once those come back. Our guide to choosing a remodeling contractor has more on comparing bids.
Want a straight answer on your project? Call RODO Development Inc. at (818) 610-9680 or send us the address. We’ll walk the property, write the scope with you, and price it line by line.
General information only, not legal advice. Building codes, zoning and permit rules change and vary by property; we confirm the current requirements for your home during design. Any schedule or timeline we discuss is an estimate. The actual timeline depends on the final scope of work, design decisions, permits and inspections, and material availability.
Common questions
How do design-build contractors price a project?
The price is built up as the design develops. Once drawings, engineering and selections are done, every trade and material is priced line by line, and the client receives a fixed proposal before construction starts.
Why won’t a contractor give me a price on the first visit?
Without drawings and selections, the scope isn’t defined yet. Layout changes, structure and finish choices move the cost more than square footage does, so an early number can only be a rough range.
What is an allowance in a construction contract?
A set budget for an item you haven’t chosen yet, such as tile, fixtures or appliances. If your final choice costs more or less, the difference is adjusted in writing.
How are changes handled after the contract is signed?
Through a written change order that states the cost and the effect on the schedule. Nothing should be built until you’ve approved it.